I read it as ora,brn,vio,wht = 3179
So if that is a date code it is 7 weeks after the one on the top ?
A really interesting question is if it was printed before or after the pins were bent into position ?
Top-level
I read it as ora,brn,vio,wht = 3179 So if that is a date code it is 7 weeks after the one on the top ? A really interesting question is if it was printed before or after the pins were bent into position ? No comments
|