Email or username:

Password:

Forgot your password?
Kees van der Leun

The full blade set for the Vestas 15 MW prototype offshore wind turbine has arrived to Østerild National Test Centre in Denmark where they will be installed.
[This one blade is longer than Utrecht's Dom tower, my own point of reference ;)]
offshorewind.biz/2022/12/22/ve

1 comment
Kees van der Leun

There's a reason that production lines for (components) of these offshore wind turbines are preferably located in or near sea ports ;)
But onshore wind turbines are becoming larger too.

Go Up