The full blade set for the Vestas 15 MW prototype offshore wind turbine has arrived to Østerild National Test Centre in Denmark where they will be installed.
[This one blade is longer than Utrecht's Dom tower, my own point of reference ;)]
https://www.offshorewind.biz/2022/12/22/vestas-v236-15-0-mw-blades-reach-final-destination-photos/
There's a reason that production lines for (components) of these offshore wind turbines are preferably located in or near sea ports ;)
But onshore wind turbines are becoming larger too.